Chery QQ Service Manual Page 39

  • Download
  • Add to my manuals
  • Print
  • Page
    / 58
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 38
II. Installation Procedure
1. Please follow the order adverse to that for disassembly to install, but care should be taken for
the following matters.
(1) When hoisting, do not install exhaust manifold first, because the longitudinal separation of
engine compartment is not big enough; otherwise, it may affect the assembly.
(2) After installation, please adjust the stroke of clutch pedal. When adjusting, adjust it to a proper
position according to the corresponding requirements, in case of a too big free stroke of clutch, it
may make sound when shifting gear or fail to release; while in case of a too small stroke, wear of
friction plate may be accelerated and travel weakness may occur, if severely, the friction plate may
be burnt out.
Chapter Ten Disassembly of Intake Manifold
I. Disassembly Procedure
1. Use an 8# sleeve to remove the four fixing bolts of
ignition coil and then remove such connections as
ignition cable/injection nozzle harness etc.
2 Use a 10# sleeve to remove the bolt of intake manifold
fixing bracket.
Page view 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 57 58

Comments to this Manuals

No comments